SAVA d.o.o. - Biomass-fired power plant

Client:
SAVA d.o.o.
Trg hrvatskih branitelja 1
35 435 Stara Gradiška
  
Short description:
Delivery of Main and detailed project for Cogeneration plant based on biomass combustion with associated equipment and infrastructure as turn-key solution. 
Onsite electrical instrumentation of complete equipment, developing and commissioning of control system for complete boiler plant with biomass supply system.

  • Low voltage distribution for boiler, biomass supply system, district heating and Utility system
  • Fire and smoke detection
  • Diesel generator 400kVA for emergency supply of equipment
  • Midle voltage distribution 35kV
  • I&C system for complete plant 

Control system is developed on Siemens PCS7 platform in redundant "fail safe" version. Control system monitors all technological units of complete plant: storage and transportation of biomass, steam boiler, electriostatic filter system, turbine plant, condensing plant, chemical water treatment plant and heating substations for the distribution of process steam for the drying and heating needs.
 
Technical data of Steam boiler:
Nominal steam capacity: 13,0 t/h
Steam outlet pressure: 40 bar
Steam Temp. outlet: 400 °C
                
Technical data of turbine plant:
Electrical power: 2000 kWe

Galerija